Punjab Chief Minister Maryam Nawaz Sharif has directed for early completion of Lahore Ring Road Southern Loop-3 project. During a surprise visit of the site, she directed to take necessary steps for construction of Ring Road Southern Loop-4 and announced to construct the SL 4 Maraka to Sharqpur Interchange M3. The Chief Minister also instructed to plant local saplings at Lahore Ring Road Interchange on Multan Road.
Home » Punjab CM directs for early completion of Lahore Ring Road Southern Loop-3 project
Punjab CM directs for early completion of Lahore Ring Road Southern Loop-3 project
- RECENT NEWS
PM vows to eradicate smuggling, strengthen economy
April 25, 2024
PM reiterates resolve to equip youth with modern education
April 25, 2024
President, PM call for raising awareness to combat malaria
April 25, 2024
FM terms Allama Iqbal as beacon of enlightenment for Muslims
April 25, 2024
Pakistan rejects 2023 Country Report on Human Rights by US
April 25, 2024
NA Speaker, MNAs discuss formation of standing committees
April 25, 2024
Maulana Abdul Wasay, Faisal Wawda take oath as senators
April 25, 2024